Американский Университет в Центральной Азии - АУЦА - Выпуск №5

Date: 1-15 March 2019

 

Kyrgyzstan

Solar systems installed in remote forest management units of Kyrgyzstan

In Russian: https://kyrtag.kg/ru/news/v-otdalennykh-gornykh-lesnichestvakh-kyrgyzstana-ustanovili-solnechnye-paneli

Vostokelectro illegally lowered electricity rates for holiday resorts

In Russian: https://24.kg/ekonomika/111673_vostokelektro_neobosnovanno_ustanovilo_nizkie_tarifyi_dlya_pansionatov/

Duty-free fuel imports from Kazakhstan will not change prices in Kyrgyzstan

In Russian: https://24.kg/ekonomika/111253_besposhlinnyie_postavki_topliva_izkazahstana_neizmenyat_tsen_vkyirgyizstane/

Illegal import of fuels and lubricants reaches 300 thousand tons annually - 20% of total market

In Russian: https://kyrtag.kg/ru/news/04002nelegalnyy-import-gsm-v-kyrgyzstane-dostigaet-300-tys-tonn-ezhegodno-ili-20-obshchego-rynka-assotsia

The price of fuel may decline by 3 percent in March

In Russian: https://24.kg/ekonomika/110786_vmarte_tsenyi_nagsm_mogut_snizitsya_na3protsenta/

Bishkek City Court to hear the case on the 5.5 billion KGS damage to Bishkek CHP plant

In Russian: https://kyrtag.kg/ru/news/obvinyaemym-po-delu-tets-bishkeka-inkriminiruetsya-ushcherb-v-5-5-mlrd-somov-delo-rassmotrit-bishkek

State coal enterprise "Kyrgyzkomur" increased production 8 times in 5 years, bringing the volume to 500,000 tons

In Russian: https://kyrtag.kg/ru/news/za-5-let-gospredpriyatie-kyrgyzkomur-uvelichilo-dobychu-v-8-raz-dovedya-obem-do-500-tys-tonn

Cheap electricity - self-deception. Why Kyrgyzstan needs to increase electricity prices

In Russian: https://rus.azattyk.org/a/kygyzstan-electricity-rate/29804097.html

 

Uzbekistan

Uzbekistan supports privatization of several thermal power plants – Elyor Ganiyev, VPM

In Russian: https://www.gazeta.uz/ru/2019/03/14/investments/

Companies from Russia, Japan and the United Arab Emirates compete for trust management of two thermal power plants in Uzbekistan

In Russian: https://podrobno.uz/cat/economic/kompanii-iz-rossii-yaponii-/

Uzbekistan plans to install over 7 million smart meters by the end of 2021

In Russian: https://podrobno.uz/cat/economic/v-uzbekistane-k-kontsu-2021-goda-plani/

Uzbekugol waiting for change: Mirziyoyev instructed to optimize coal tariffs and increase industry profitability

In Russian: https://podrobno.uz/cat/economic/uzbekugol-zhdut-pereme/

Uzbekenergo has developed a model for restructuring the power industry

In Russian: https://podrobno.uz/cat/economic/uzbekenergo-zavershila-razrabotku-/

Uzbekistan owes Lukoil about US $600 million for gas deliveries in 2018

In Russian: http://uzdaily.uz/ru/post/42305

Lukoil signs an agreement to study a colossal field in the north-west of Uzbekistan

In Russian: https://www.interfax.ru/business/653805

Measures taken to improve the management efficiency of the national coal company Uzbekugol JSC

In Russian: http://uzdaily.uz/ru/post/42298

Russian company Zarubezhneft agrees to develop three mature fields in Uzbekistan

In Russian: http://uzdaily.uz/ru/post/42246

Press conference on the implementation of automated electricity metering and control system

In Russian: http://energo-cis.ru/news/6_marta_2019_goda_v/?year=2019&month=3

 

Tajikistan

Total power blackout in Tajikistan explained by repair works

In Russian: https://tajikta.tj/ru/news/v-tadzhikistane-totalnoe-otklyuchenie-sveta-energetiki-obyasnyayut-remontnymi-rabotami

Coal production for January and February of 2019 up by 63,000 tons over the first two months of last year

In RussianÑ https://tajikta.tj/ru/news/v-tadzhikistane-za-dva-mesyatsa-proizvedeno-na-63-tys-tonn-uglya-bolshe-proshlogodnego

Funds from the sale of a network of petrol stations went to the construction of the Rogun hydropower station

In Russian: https://tajikta.tj/ru/news/v-tadzhikistane-sredstva-ot-prodazhi-chastnoy-seti-azs-poshli-na-stroitelstvo-rogunskoy-ges

Second phase of the reconstruction of the Kairakkum hydropower station will begin in April

In Russian: https://tajikta.tj/ru/news/v-tadzhikistane-2-yu-fazu-rekonstruktsii-kayrakkumskoy-ges-nachnetsya-v-aprele

The implementation of the Tajik section of CASA-1000 will begin in mid-March

In Russian: https://tajikta.tj/ru/news/-realizatsiya-uchastka-tadzhikistana-po-proektu-casa-1000-nachnetsya-v-seredine-marta

Tajikistan is starting rehabilitation of Nurek hydropower plant

In Russian: https://news.tj/ru/news/tajikistan/economic/20190311/v-tadzhikistane-pristupayut-k-reabilitatsii-nurekskoi-ges

Tajikistan will receive a US $ 40 million EFSD loan for the rehabilitation of Nurek hydropower plant

In Russian: https://news.tj/ru/news/tajikistan/economic/20190306/tadzhikistan-poluchit-kredit-efsr-dlya-reabilitatsii-nureka-posle-podpisaniya-soglasheniya

Tajik power engineers commend the effectiveness of the South-North 500 kV transmission line project

In Russian: http://avesta.tj/2019/03/05/tadzhikskie-energetiki-otmechayut-vysokuyu-effektivnost-proekta-lep-yug-sever-500-kv/

 

Kazakhstan

Kazakhstan to launch first phase of a new wind farm

In English: https://en.trend.az/business/energy/3027817.html

Rebuilding Almaty’s power system

In Russian: https://kapital.kz/economic/76302/v-almaty-perestraivayut-energosistemu.html

Kazakhstan will supply Uzbekistan with up to 2 million tons of oil per year

In Russian: http://m.inform.kz/ru/article/3507141-kazahstan-budet-ezhegodno-postavlyat-uzbekistanu-do-2-mln-tonn-nefti

Kazakh and Japanese nuclear scientists discussed cooperation on a fusion reactor project

In Russian: http://m.inform.kz/ru/article/3507228-kazahstanskie-i-yaponskie-yaderschiki-obsudili-sotrudnichestvo-po-proektu-mezhdunarodnogo-termoyadernogo-reaktora

Last year, Kazakhstan delivered more than 260 thousand tons of oil to Uzbekistan

In Russian: https://dknews.kz/neft/za-proslyi-god-kazahstan-postavil-v-uzbekistan-bolee-260-tysac-tonn-nefti.html

Growth in violations during coal transport in Pavlodar region

In Russian: https://dknews.kz/regiony/cislo-narusenii-pri-perevozke-ugla-rastet-v-pavlodarskoi-oblasti.html

Kazmunaygas and Eni agreed to develop the Abay oil field in the Caspian Sea

In Russian: https://ru.reuters.com/article/businessNews/idRUKBN1QS1MQ-ORUBS

US $ 11.5 million solar power plant to be built in South Kazakhstan

In Russian: https://kapital.kz/economic/76565/na-yuge-kazahstana-postroyat-solnechnuyu-elektrostanciyu-za-11-5-mln.html

Oil cannot be replaced

In Russian: https://kapital.kz/economic/76493/neft-zamenit-nelzya-ostavit.html

Kazakhstan increased gas supplies to Russia and China

In Russian: https://www.kt.kz/rus/economy/_1377881593.html

Hydropower plants in Eastern Kazakhstan are preparing for environmental releases

In Russian: https://www.inform.kz/ru/gidroelektrostancii-vko-gotovyatsya-k-prohozhdeniyu-prirodoohrannogo-popuska_a3505245

Kazakhstan plans to fully digitize its energy sector in five years

In Russian: http://energo-cis.ru/news/kazahstan_planiruet_polnostyu/

 

Turkmenistan

Çalık Enerji to modernize turbines at the Mary power plant

In Russian: http://www.turkmenistan.gov.tm/?id=18236

Turkmenistan and Pakistan ink main agreement on TAPI

In English: https://en.trend.az/business/energy/3032079.html

Metropolitan energy enterprise Gosenergonadzor gets a settlement center

In Russian: http://tdh.gov.tm/news/articles.aspx&article17162&cat14

Work is ongoing on the strategy for the development of the Turkmenbashi complex of oil refineries

In Russian: http://tdh.gov.tm/news/articles.aspx&article17161&cat14

Russia supplies gas meters to Turkmenistan

In English: https://en.trend.az/casia/turkmenistan/3030379.html

EU welcomes Turkmen policy on diversification of energy supplies

In English: https://en.trend.az/casia/turkmenistan/3026677.html

 

Other regional news

Central Asia Workshop on Long-Term Capacity Expansion Planning with a High Share of Renewables

In English: https://www.irena.org/events/2019/Mar/Workshop-on-long-term-capacity-expansion-planning-with-a-high-share-of-renewables

 

Analysis

Profitable or unpromising: why does Uzbekistan need a nuclear power plant

In Russian: https://podrobno.uz/cat/economic/vygodno-ili-opasno-i-bespers/

Analysis of the Kazakh electricity and coal market for January 2019

In Russian: https://www.samruk-energy.kz/images/2019/akcioneram/analitechkii-razbor-january2019.docx

Why is green energy developing at a slow pace in Kazakhstan’s Karaganda region?

In Russian: https://kursiv.kz/news/otraslevye-temy/2019-03/pochemu-zelenaya-energetika-v-karagandinskoy-oblasti-razvivaetsya  

 


Телефон: +996 (312) 915000 доп. 326, 327

Email: tspc@auca.kg

Адрес: Кыргызстан, 720060, Бишкек, ул. Аалы Токомбаева, 7/6

 

FAQ


American University of Central Asia
7/6 Aaly Tokombaev Street
Bishkek, Kyrgyz Republic 720060

Тел.: +996 (312) 915000 + Вн.
Факс: +996 (312) 915 028
Контакты АУЦА